AASB S2 reporting has already started. · Get your Supplier Emissions Certificate in 7 days, fixed price.
For Reporting Entities · Bulk supplier programs

Thousands of suppliers. One standardised data set. Zero chasing.

Your Scope 3 number is only as good as your supplier data, and your suppliers aren't going to make it easy. Less Carbon runs a managed outreach, assessment and certification program across your supply chain, and hands back real, accurate supplier data at scale, in a standardised form, so it isn't more work than it already is for your team. As many as you need, scheduled if required.

Pilot wave in 30 days Standardised, audit-ready outputs 20% off bulk programs of 50+ suppliers
Ten minutes on the scoping form gets you a structured proposal. No meetings required.
Why this can't wait

A supply chain you can't certify is a bottom-line risk, not a reporting footnote.

Scope 3 isn't a disclosure exercise. It's a supply-chain problem that lands in your numbers, your audit and your investor scrutiny. And you don't have two years to re-engineer who you buy from before the next deadline.

Noexit

You can't escape it, and you can't outrun it.

Scope 3 sits across your entire supplier base. You can't disclose your way around a data gap, and rebuilding a supply chain to dodge it takes years you don't have before reporting falls due.

The exposure
$$$

Disruption hits the bottom line, not just the report.

Suppliers who can't produce data stall procurement, delay tenders and force last-minute replacements. The cost of a disrupted supply chain dwarfs the cost of getting those suppliers assessed and certified.

The cost
?

Can you even trust the data you collect yourself?

Inconsistent supplier responses raise the questions an auditor will: where did the number come from, how was it calculated, how long did it take, and will it hold up? Unverified data is a liability on your disclosure.

The trust gap
The supplier data gap

Scope 3 made your suppliers' emissions your reporting problem.

Most suppliers aren't ready, don't understand what's being asked, or believe it doesn't apply to them because they don't report directly to government. That gap lands on your desk.

1000s

of inconsistent answers, if you collect it yourself.

Spreadsheets, portals, ad hoc emails, every supplier responds differently. Your team ends up interpreting, massaging and re-keying thousands of completely different responses before the data is usable.

The standardisation problem
0hrs

your internal team has spare to chase suppliers.

Supplier data collection is a program, not an email blast. Follow-ups, missing documents, education, escalation. Done internally, it swallows procurement and sustainability capacity for months.

The capacity problem
$$

replacing unready suppliers costs more than certifying them.

Cutting long-standing suppliers because they can't produce emissions data is expensive and disruptive. Getting them assessed and certified protects the relationship and your reporting timeline.

The procurement problem
What the program delivers

Managed outreach in. Standardised, audit-ready data out.

You hand over a supplier list. We run the program. Your systems receive reports in one consistent format, no interpretation required.

Managed supplier outreach

We invite, onboard and follow up your suppliers in scheduled batches, under your brand, ours, or co-branded. Automated reminders and missing-information requests, so your team only handles exceptions.

Assessment + certificate for every supplier

Each supplier receives a Scope 1 + 2 Carbon Assessment and a certified Supplier Emissions Certificate with a unique reference number, AASB S2 compliant, built on government and industry standards.

One standardised format, straight into your systems

Every report arrives in the same structure: same methodology, same fields, same format. Massive on accuracy, time saving and cost saving, and a competitive advantage when your reporting holds up and your competitors' doesn't.

Program reporting and delivery pack

Progress visibility across every batch: suppliers invited, onboarded, certified, outstanding. Each phase closes with a delivery pack, certificates, emissions summary, exceptions list and recommended next steps.

How it works

From supplier list to certified data, in 4 steps.

Everything runs online. The scoping form asks the structured questions a consultant would, then the program does the rest.

Step 01

Scope your program

The online scoping form captures your reporting group, supplier base, priority categories and rollout timing. The system triages your program structure automatically.

10 minutes
Step 02

Receive your proposal

A structured proposal: recommended batch size, process, timeline and locked per-supplier pricing. Pilot, staged rollout or full program, your call.

Within days
Step 03

We roll out in batches

You provide the supplier list and contacts. We onboard suppliers in scheduled batches, run every assessment and chase every gap. Your team sees progress, not problems.

Pilot in 30 days
Step 04

Receive your delivery pack

Certificates, emissions summary, completion report and exceptions list, in one standardised format your reporting and procurement systems can use immediately.

Each batch

Programs are priced per supplier and scoped to your list. Bulk programs of 50+ suppliers receive a 20% discount. Locked in your proposal before anything starts.

Three ways to run it

Start small or go wide. Scheduled if required.

The scoping form recommends a structure, you choose the pace.

A

Pilot Batch

A first wave across your priority suppliers. Proves the process, surfaces data issues early and gives your team a delivery pack to socialise internally. Live within 30 days.

Best first step
B

Staged Rollout

Your supplier base assessed in scheduled batches, sequenced by category, risk or procurement priority, aligned to your reporting calendar.

Most common
C

Full Supplier Program

Broad supply-chain coverage across multiple categories or business units, with ongoing batches, renewals and program reporting as standard.

Full coverage
Who's captured, and when

The wave has already started. It reaches everyone's supply chain.

AASB S2 mandatory climate reporting rolls out in three groups. Whichever group you're in, your Scope 3 number needs supplier data to stand up.

Group 1

Reporting from 1 July 2025

Already reporting
  • $500m+ consolidated revenue
  • $1bn+ gross assets
  • 500+ employees
Group 2

Reporting from 1 July 2026

This financial year
  • $200m+ consolidated revenue
  • $500m+ gross assets
  • 250+ employees
Group 3

Reporting from 1 July 2027

Next in line
  • $50m+ consolidated revenue
  • $25m+ gross assets
  • 100+ employees

Capture test: an entity is captured when it meets at least two of the three thresholds for its group. Government bodies, councils, procurement groups, major contractors and infrastructure projects are driving the same supplier data requests through their own frameworks.

Program questions, answered straight

What reporting entities ask us.

If yours isn't here, the methodology page goes deeper.

What does a bulk supplier program include?

Managed supplier outreach, intake and data collection, a Carbon Assessment and Supplier Emissions Certificate for every supplier, automated follow-up on missing information, and structured progress reporting back to you.

What do we receive at the end of a batch?

A structured delivery pack: completed supplier certificates, a supplier emissions summary, batch completion report, supplier status report, unresolved supplier list, data quality notes and recommended next steps.

How standardised is the supplier data?

Every supplier is assessed on the same methodology and reported in the same format. No interpreting, massaging or re-keying thousands of different spreadsheets into your systems.

How fast can a program start?

A pilot wave can be live within 30 days of scoping. Full programs are scheduled to your reporting calendar and rolled out in batches.

How is a program priced?

Per supplier, scoped to your supplier list, batch size and the level of outreach you want managed. Bulk programs of 50+ suppliers receive a 20% discount. Your proposal includes locked pricing before anything starts.

Do our suppliers pay anything?

No. Suppliers in your program are covered by the program. They complete a short online intake, upload their records and receive their own Carbon Assessment and Supplier Emissions Certificate.

Get it done

Real supplier data. Standardised. Done for you.

Lower cost than building it internally, faster than educating every supplier one by one, and far less disruptive than replacing the ones who aren't ready. Scope your program and have a pilot wave live in 30 days.

Ten minutes on the scoping form. No meetings, no consultants, no pain.